Pre-drill cable holes (typically 200 mm x 200 mm) in the walls for routing power cables between the machine and control rooms. 2. Mechanical Assembly

Installing a like the popular GXR series is a high-stakes technical procedure that blends heavy mechanical assembly with delicate digital calibration. According to official documentation, the process involves a specific sequence of hardware assembly, electrical wiring, and software synchronization to ensure clinical safety and image precision. 1. Mechanical Assembly & Structural Setup

: Verify that the ceiling rails and floor rails are correctly aligned. For ceiling-mounted systems, ensure the overhead support beams are of high quality and firmly secured. Power Supply

, following the service manual ensures safety and equipment longevity.

Access the "System Setup" through the membrane control console by entering the required service password.